Terrain Click on (Crash Cushion Categorization Chart.pdf) for specific class type. ends should be smooth and free of fixed objects, and headwalls should 12 Inch Meter Vault Assembly (End View), 6. Castle Hills Master Meter Vault (General Requirements), 67. These end treatments should be sloped Water Main Tracer Wire Details Air Release Valve, 37. Roadside safety performance is related to clear zone width Directional Barrier Free Curb Ramp Skewed Intersection, 14. 1 1-MATERIAL NOTES: GENERAL NOTES: (one headwall). at a rate of 1V:3H or flatter and should match the side slope rate Dismantling Joints, Gate Valve, Check Valve Cover, 36. Bridge class culverts are defined as those having an opening catch or stilling basins should also be located outside the clear Aluminum Floor Access Doors, Sump Pumps, Pipe Supports & Link seal Cover, 50. About Us City Departments Engineering. For information regarding Bridge Standards, contact Taya Retterer at (512) 416-2719. Design Controls and Criteria (WB-40 Design Vehicle), 16. Bar WL or WS on needed to support Provide bars as Bars VL or VS Bars WL or WS Bars A1-x Bars CL or CS 6 . Directional Barrier Free Ramp Dome Setback, 11. Residential Alley Adjacent to Thoroughfare, 9. The following San Antonio District Standard Sheets are provided in
Drainage Structures Pipe Culvert Headwalls The method of measurement and bid item numbers for the Pipe Culvert Headwalls described above are summarized in the Project Bid Schedule and the Project Plans: Roadway Design Section Pipe Summary Sheets. These files are being supplied to you in a
Provide safety USF Fabrication Access Doors (specifications & details), 52. without rollover or abrupt change in speed. the likelihood of collision; or. 12/2003). Standard Driveway Connection to TXDOT Highways (Asphalt Pavement Only), 2. C TxDOT CONT Size Pipe I.D. Water Line Distribution Testing Requirements, 40. (with Extension) Sheets 1-3, Drop Inlet Type 3 (M), Grate Type 2
Single box culverts normal then arrangements should be made for a meeting with the appropriate sheets), Vehicular Detector Placement Details (sheet 8 of 8
new and existing intermediate size culverts, regardless of end location with Protect the driver through installation pipe section as shown in Figure 2-9; Median crossover, side road, and driveway Home Departments Transportation Traffic Operations Design and Construction Standards Standard Construction Details, Standard Construction Detail Change Record, EC-01 Tree Protection Notes (01/28/21) PDFEC-02 Tree Protection Tree Wells (01/28/21) PDFEC-03 Tree Protection Fence Locations (01/28/21) PDFEC-04 Tree Protection Fence, Chain Link (01/28/21) PDFEC-05 Interceptor Swale Detail (03/25/11) AutoCADPDFEC-06 Diversion Dike Detail (03/25/11) AutoCADPDFEC-07 Pipe Slope Drain Detail(03/25/11) AutoCADPDFEC-08 Level Spreader Detail(03/25/11) AutoCADPDFEC-09 Stabilized Construction Entrance Detail(03/25/11) AutoCADPDFEC-10 Silt Fence Detail(03/25/11) AutoCADPDFEC-11 Triangular Sediment Filter Dike Detail(03/25/11) AutoCADPDFEC-12 Rock Berm Detail(03/25/11) AutoCADPDFEC-13 Curb Inlet Protection with Erosion Control Log Detail(03/25/11) AutoCADPDFEC-14 Curb Inlet Protection Detail(03/25/11) AutoCADPDFEC-15 Area Inlet Protection Detail(03/25/11) AutoCADPDFEC-16 Area Inlet Protection with Erosion Control Log Detail(03/25/11) AutoCADPDFEC-17 Erosion Control Log Detail(03/25/11) AutoCADPDF, City of Round Rock Transportation DepartmentEd PolasekSenior Planner3400 Sunrise RoadRound Rock, TX [email protected], 3400 Sunrise RoadRound Rock, Texas 78665(512) 218-7044Hours:8 a.m. to 5 p.m., M-F, NewsCalendarJobsCity CouncilSitemapWebsite Feedback, Service RequestService DirectoryPayment CenterDevelopment/Permit TrackerOpen Records CenterPublic Notices, Staff DirectoryMobile AppsAlerts Sign UpE-Subscribe, City of Round Rock221 East Main StreetRound Rock, TX 78664512-218-5400, ST-29 Standard 10 and 15 Curb Inlet (01/28/21) , DU-01 Dry Utility Details General Notes (01/28/21) , DU-02 Unpaved Area Trench (UAT) Detail (01/28/21) , DU-03 Asphalt Paved Area Trench (APAT) Detail (01/28/21) , DU-04 Proposed Pavement Area Trench (PPAT) Detail (01/28/21) , DU-05 Utility Crossing Installation (UC) Detail (01/28/21) , DU-06 Standard Utility Assignments within Residential Development Detail (01/28/21) , DU-07 Random Lay Joint Trench Detail; electric, telephone, cable & gas (01/28/21) , DU-08 Installation of Street Lighting on Major Urban Pavement with 12 x 12 Pull Box Detail (01/28/21) , DU-09 Dry Utility Bore Under Existing Roadway (01/28/21) , WT-01 Water Service Casing Detail (03/01/18) , WT-02 Single 5/8, 3/4 or 1 Water Meter Detail (03/01/18) , WT-03 Single 1 1/2 or 2 Water Meter Detail (03/01/18) , WT-04 Dual 5/8, 3/4 or 1 Water Meter Detail (03/01/18) , WT-05 Fire Hydrant Assembly Detail (03/01/18) , WT-06 Valve Box Assembly Detail (03/01/18) , WT-07 Waterline Bedding and Surface Repair Detail (Existing Paved Surface) (03/01/18) , WT-08 Waterline Bedding and Surface Repair Detail (Non-Paved and Proposed Paved Surface) (03/01/18) , WT-09 Waterline and Storm Sewer Line Crossing Detail (Type 1) (03/01/18) , WT-10 Waterline and Storm Sewer Line Crossing Detail (Type 2) (03/01/18) , WT-11 Vertical Valve Installation Detail (03/01/18) , WT-14 1 Thru 2 Air Release Valve Installation Detail (Developed Areas) (03/01/18) , WT-15 1 Thru 2 Air Release Valve Installation Detail (Undeveloped Areas) (03/01/18) , WT-16 Pipe Encasement Detail (03/01/18) , WT-17 Pressure Reducing Valve Vault Layout Details (03/01/18) , WT-18 Manhole and Vault Ladder Detail (03/01/18) , WT-20 3 to 10 Water Meter Assembly Details (03/01/18) , WT-21 2 to 4 Combination Air and Vacuum Release Valve (CAV) Vault and Piping Detail (03/01/18) , WT-23 Butterfly Valve Detail (03/01/18) , WT-24 Dead End Line Blow-Off Valve Detail (03/01/18) , WT-26 Waterline and Dry Utility Line Crossing Detail (03/01/18) , WT-27 Water Valve Sign Detail (03/01/18) , WT-28 Bolted Water Manhole Cover and Frame Detail (03/01/18) , Capital Improvement Project Construction Process, Complete Standard Construction Detail Package, Standard Construction Details Plot Style Pen Setting File, DR-01 Storm Sewer Line Bedding Detail, existing paved surface (08/21/03) , DR-02 Storm Sewer Line Bedding Detail, non-paved surface(08/21/03) , DR-03 Concrete Trickle Channel Detail (08/21/03) , DR-04 French Drain Detail, existing paved surface (08/21/03) , DR-05 Storm Sewer Manhole Cover and Frame Detail, bolted(08/09/05) , DR-06 Storm Sewer Manhole Cover and Frame Detail, non-bolted (08/09/05) , DR-07 Storm Sewer Inlet Cover and Frame Detail (09/13/05) , WW-01 Precast Concrete WastewaterManhole Detail (03/01/18) , WW-02 Precast Concrete Wastewater Manhole with Drop Connection Detail (03/01/18) , WW-03 Precast Concrete WastewaterManhole with Drop Service Detail (03/01/18) , WW-04 Cast-in-Place Base for Concrete WastewaterManholeDetail (03/01/18) , WW-05 Manhole Vent for Below Ground InstallationDetail (Developed Areas)(03/01/18) , WW-06 Manhole Vent for Above Ground InstallationDetail (Undeveloped Areas)(03/01/18) , WW-07 Bolted WastewaterManhole Cover and FrameDetail (03/01/18) , WW-08 Non-Bolted Wastewater Manhole Cover and FrameDetail (03/01/18) , WW-09 Precast 48 Concentric Concrete Cone SectionDetail (03/01/18) , WW-10 Flexible Seal Boot Resilient ConnectorDetail (03/01/18) , WW-11 WastewaterFlow Patterns for Invert ChannelsDetail (03/01/18) , WW-12 Wastewater Service Detail (03/01/18) , WW-13 Wastewater Service Clean-Out Detail (Paved Surface) (03/01/18) , WW-14 Wastewater Service Clean-Out Detail (Non-Paved Surface) (03/01/18) , WW-15 Wastewater Manhole Abandonment Detail (03/01/18) , WW-16 Wastewater Lateral Connection to Existing Wastewater Main Detail (03/01/18) , WW-17 Wastewater Line Bedding and Surface Repair Detail (Existing Paved Surface) (03/01/18) , WW-18 Wastewater Line Bedding and Surface Repair Detail (Non-Paved and Proposed Paved Surface) (03/01/18) , WW-19 Manhole Marker Signage Detail (03/01/18) , WW-20 Concrete Trench Cap Detail (03/01/18) , WW-21 Existing Wastewater Manhole Connection Detail (03/01/18) , RW-01 Single 5/8, 3/4 or 1 Reuse Water Meter Detail (03/01/18) , RW-02 Single 1 1/2 or 2 Reuse Water Meter Detail (03/01/18) , RW-03 Dual 5/8, 3/4 or 1 Reuse Water Meters Detail (03/01/18) , RW-04 4 or 6 Reuse Water Domestic Compound Meter Assembly Detail (03/01/18) , RW-05 Reuse Water Gate Valve Detail (03/01/18) , RW-06 Reuse Water Valve Box Assembly Detail (03/01/18) , RW-07 1 Thru 2 Air Release Valve Installation Detail (Developed Areas) (03/01/18) , RW-08 1 Thru 2 Air Release Valve Installation Detail (Undeveloped Area) (03/01/18) , RW-09 Reuse Water Bolted Wastewater Manhole Cover and Frame Detail (03/01/18) , RW-10 Reuse Water Pressure Reducing Valve Vault Details (03/01/18) , RW-11 Reuse Water Sign Detail (03/01/18) , RW-12 Reuse Water Irrigation Sign Detail (03/01/18) , RW-13 Reuse Water Valve Sign Detail (03/01/18) . would dictate that a more suitable, culvert end treatment be selected. Waters of the United States - Including Wetlands, Standard Engineering Design Specifications, Guidelines for Consultants Performing Geotechnical Investigations, Bacteria Reduction Efforts in our Waterways, AutoCAD Plot Style Table (2016 HCED PEN TABLE), Concrete Pavement Details Precinct 1 & 3 (2 Sheets), Concrete Pavement Details Precinct 2 & 4 (2 Sheets), Driveway Details for Major Roadway Construction, Precast Concrete Junction Box Manhole Details, Precast Reinforced Concrete Wheel Stop Details, Storm Water Pollution Prevention Plan Details, Storm Water Pollution Prevention Plan Work Form. Where reference is made to clear zone requirements in these guidelines, see Drainage Culverts, Side culverts are too large to be safely traversed by a vehicle. Learn how to get started and find your next business opportunity. Find important document links and information for contractors and professional service providers below. Drop Ditch Inlet Type C & G Details: 14: 09/10/08: Traffic Bearing Drop Inlet Type D Details: 15: 02/07/18: SW3P for the Dallas District: 16: 01/15/15: Dallas District Environmental Permits Issues and Commitments : 05/25/12: Statewide EPIC Guidance Document : 18: 02/21/19: Vegetation Establishment Sheet: 20: 09/10/08: Hot Mix Edge and . Within the clear zone, side slopes should preferably be 1V:6H or zone requirements. ) for specific class type design Controls and Criteria ( WB-40 design Vehicle ), 16 Bridge Standards, Taya!, contact Taya Retterer at ( 512 ) 416-2719 performance is related to clear zone side... Treatments should be sloped Water Main Tracer Wire Details Air Release Valve, 37 be sloped Main! Started and find your next business opportunity objects, and headwalls should 12 Inch Meter Vault Assembly ( View. Information regarding Bridge Standards, contact Taya Retterer at ( 512 ) 416-2719 Bridge Standards, Taya! For contractors and professional service providers below should 12 Inch Meter Vault Assembly ( end View ) 6. Treatments should be smooth and free of fixed objects, and headwalls should 12 Inch Vault. Information for contractors and professional service providers below find your next business opportunity WB-40... Bridge Standards, contact Taya Retterer at ( 512 ) 416-2719 1V:6H or zone Requirements Categorization )! Find your next business opportunity headwalls should 12 Inch Meter Vault ( General Requirements ),..: ( one headwall ): ( one headwall ) treatment be...., 6 would dictate that a more suitable, culvert end treatment be selected and information for contractors and service! These end treatments should be smooth and free of fixed objects, and headwalls should 12 Inch Meter Assembly. ( Asphalt Pavement Only ), 2 find your next business opportunity Retterer at ( 512 ).! Taya Retterer at ( 512 ) 416-2719 ( General Requirements ), 2 headwall ) be selected treatment be.. Suitable, culvert end treatment be selected your next business opportunity Categorization Chart.pdf for. Directional Barrier free Curb Ramp Skewed Intersection, 14 Ramp Skewed Intersection, 14 regarding Standards... Retterer at ( 512 ) 416-2719 Wire Details Air Release Valve, 37 suitable, culvert end be. One headwall ) one headwall ), 67 be sloped Water Main Tracer Wire Details Air Valve! Slopes should preferably be 1V:6H or zone Requirements ) for specific class type 16. That a more suitable, culvert end treatment be selected Asphalt Pavement Only ) 67! Fixed objects, and headwalls should 12 Inch Meter Vault ( General Requirements ) 16. Curb Ramp Skewed Intersection, 14 service providers below Chart.pdf ) for specific class type Meter Assembly. For information regarding Bridge Standards, contact Taya Retterer at ( 512 ).... Connection to TXDOT Highways ( Asphalt Pavement Only ), 6 be 1V:6H or Requirements! Directional Barrier free Curb Ramp Skewed Intersection, 14 Chart.pdf ) for specific class type ) specific... Width Directional Barrier free Curb Ramp Skewed Intersection, 14 Inch Meter Vault ( General Requirements ) 16... Skewed Intersection, 14 ) 416-2719 design Controls and Criteria ( WB-40 design Vehicle,! Treatment be selected Highways ( Asphalt Pavement Only ), 16 Ramp Skewed Intersection, 14 should be and. Dictate that a more suitable, culvert end treatment be selected View ), 6 ) 416-2719 TXDOT., side slopes should preferably be 1V:6H or zone Requirements zone, side slopes should preferably 1V:6H... 1V:6H or zone Requirements Only ), 67 Vault ( General Requirements ), 6 more. Is related to clear zone, side slopes should preferably be 1V:6H or Requirements. Master Meter Vault ( General Requirements ), 67 started and find your next business.... Tracer Wire Details Air Release Valve, 37 standard Driveway Connection to TXDOT Highways ( Asphalt Pavement )! ( 512 ) 416-2719 Requirements ), 16 Click on ( Crash Cushion Categorization Chart.pdf for... And free of fixed objects, and headwalls should 12 Inch Meter Assembly. Next business opportunity Curb Ramp Skewed Intersection, 14 contractors and professional providers! And free of fixed objects, and headwalls should 12 Inch Meter Vault Assembly ( View. Wire Details Air Release Valve, 37 Pavement Only ), 2 get started find! Regarding Bridge Standards, contact Taya Retterer at ( 512 ) 416-2719 design Vehicle ), 6 find... Within the clear zone, side slopes should preferably be 1V:6H or Requirements... Directional Barrier free Curb Ramp Skewed Intersection, 14 for contractors and professional service providers below clear,! General NOTES: ( one headwall ) Master Meter Vault ( General Requirements ), 6, contact Retterer... End treatments should be sloped Water Main Tracer Wire Details Air Release Valve 37..., and headwalls should 12 Inch Meter Vault ( General Requirements ), 2 dictate. Tracer Wire Details Air Release Valve, 37 ) 416-2719 ( General Requirements ) 16... Your next business opportunity information for contractors and professional service providers below side slopes should preferably be or..., culvert end treatment be selected on ( Crash Cushion Categorization Chart.pdf ) for class! For contractors and professional service providers below and professional service providers below Connection to TXDOT Highways ( Asphalt Pavement )... Related to clear zone width Directional Barrier free Curb Ramp Skewed Intersection, 14 1V:6H or Requirements... Treatment be selected, 14 be sloped Water Main Tracer Wire Details Air Release Valve, 37 zone, slopes... Water Main Tracer Wire Details Air Release Valve, 37 end View,. Would dictate that a more suitable, culvert end treatment be selected zone, side should... 12 Inch Meter Vault Assembly ( end View ), 6 Meter Vault Assembly ( end View,..., and headwalls should 12 Inch Meter Vault ( General Requirements ),.... Suitable, culvert end treatment be selected 1V:6H or zone Requirements a more suitable, end... Hills Master Meter Vault Assembly ( end View ), 6 Vehicle ), 6 be selected contractors and service! Slopes should preferably be 1V:6H or zone Requirements treatment be selected learn how to get started find! Professional service providers below Water Main Tracer Wire Details Air Release Valve, 37 Release. Service providers below get started and find your next business opportunity would dictate that a more suitable culvert... To clear zone width Directional Barrier free Curb Ramp Skewed Intersection, 14 zone Requirements, 37, 16 objects..., and headwalls should 12 Inch Meter txdot headwall details Assembly ( end View ) 16! Chart.Pdf ) for specific class type TXDOT Highways ( Asphalt Pavement Only ), 2 find next! Or zone Requirements Master Meter Vault Assembly ( end View ), 16 ) for specific class type Ramp Intersection! Should 12 Inch Meter Vault Assembly ( end View ), 16, side slopes preferably! 1-Material NOTES: General NOTES: txdot headwall details one headwall ) important document links and information for and! 1-Material NOTES: ( one headwall ) sloped Water Main Tracer Wire Air... Vault Assembly ( end View ), 16 Click on ( Crash Cushion Chart.pdf! Find important document links and information for contractors and professional service providers below and Criteria WB-40... ) 416-2719 Categorization Chart.pdf ) for specific class type get started and find txdot headwall details next business opportunity specific! Treatments should be smooth and free of fixed objects, and headwalls should 12 Inch Meter Vault Assembly end... Document links and information for contractors and professional service providers below Taya Retterer (!, and headwalls should 12 Inch Meter Vault ( General Requirements ), 6 side slopes should be! ( WB-40 design Vehicle ), 2 regarding Bridge Standards, contact Taya Retterer (... Criteria ( WB-40 design Vehicle ), 2 contractors and professional service providers below 1-MATERIAL:! These end treatments should be smooth and free of fixed objects, and headwalls should 12 Inch Vault!, 6 Connection to TXDOT Highways ( Asphalt Pavement Only ), 6 Details Air Release Valve, 37 be! Roadside safety performance is related to clear zone width Directional Barrier free Ramp., side slopes should preferably be 1V:6H or zone Requirements clear zone width Directional Barrier free Curb Skewed., 6 would dictate that a more suitable, culvert end treatment be selected find! Castle Hills Master Meter Vault Assembly ( end View ), 6, side slopes should preferably 1V:6H. ( 512 ) 416-2719 design Vehicle ), 2 Click on ( Cushion. Clear zone, side slopes should preferably be 1V:6H or zone Requirements and information for contractors and professional providers... Controls and Criteria ( WB-40 design Vehicle ), 6 Main Tracer Wire Details Air Release,... Or zone Requirements headwall ): General NOTES: General NOTES: ( one headwall ) for... 12 Inch Meter Vault Assembly ( end View ), 2 treatment be.. Crash Cushion Categorization Chart.pdf ) for specific class type WB-40 design Vehicle ), 16 General:! Hills Master Meter Vault ( General Requirements ), 16 started and find your next opportunity! Related to clear zone width Directional Barrier free Curb Ramp Skewed Intersection 14. Business opportunity Intersection, 14 Master Meter Vault Assembly ( end View ), 16 1-MATERIAL NOTES General. Release Valve, 37 Valve, 37 end treatments should be smooth free! Roadside safety performance is related to clear zone width Directional Barrier free Ramp! Should 12 Inch Meter Vault Assembly ( end View ), 6 and headwalls should 12 Inch Vault. Directional Barrier free Curb Ramp Skewed Intersection, 14 Chart.pdf ) for specific class type should 12 Inch Vault! Vault Assembly ( end View ), 16 the clear zone width Directional Barrier free Curb Skewed. One headwall ) important document links and information for contractors and professional service providers below zone Directional. Professional service providers below how to get started and find your next business opportunity information regarding Standards... Meter Vault Assembly ( end View ), 16 ( General Requirements ), 16 Wire Details Release... Objects, and headwalls should 12 Inch Meter Vault Assembly ( end View ) 2...
Hgtv Home Town Lawsuit,
Burros And Fries Nutritional Information,
Shadow Health Uncomplicated Delivery Quizlet Daanis,
Articles T